PMS

Overview of Ship Planned Maintenance System (PMS)

· Norsetech Group

What a ship Planned Maintenance System does, how its equipment hierarchy and maintenance tasks are organised, and how it links to spare parts and compliance reporting.

1. What a PMS is for

A Planned Maintenance System (PMS) gives a ship a structured way to plan, carry out and record maintenance on board. It replaces scattered lists and memory with one schedule that both the ship and the office can see.

Key features

  1. Standardised maintenance procedures for each piece of equipment
  2. A register of equipment and components
  3. Maintenance intervals based on calendar time, running hours or both
  4. A history of the maintenance carried out

Benefits

  1. Supports compliance with class and regulatory requirements, including the ISM Code
  2. Improves the safety and reliability of vessel operations
  3. Helps with budgeting and spare parts planning
02 /

Equipment hierarchy

Equipment is organised in levels, so that every task belongs to a specific item and can be reported at any level:

  • Ship → System → Equipment → Component
  • Each component can have several maintenance tasks
  • Many fleets organise the hierarchy to a ship coding standard such as the SFI Group System

Example

LevelExample
ShipMV ABCD
SystemMain propulsion
EquipmentMain engine
ComponentFuel injection pump
03 /

Maintenance tasks

Types of task

  • Preventive maintenance: done at a set interval of time or use, before failure
  • Corrective maintenance: done after a fault has occurred
  • Condition-based maintenance: done when inspections or measurements, such as oil analysis or vibration readings, show it is needed

Typical intervals

  • Weekly, monthly, quarterly or yearly
  • Every set number of running hours, as specified by the equipment maker

What a task contains

  • Task reference and title
  • Procedure description
  • Tools and spare parts required
  • Safety precautions
  • Checklist or acceptance criteria
04 /

Spare parts and inventory

The PMS links maintenance to the parts it needs, so required spares are on board when a task falls due:

  • each component can have its spare parts linked to it;
  • minimum stock levels can trigger reordering;
  • parts consumed are recorded against the task.

This reduces downtime, supports cost-effective stock control and connects maintenance with purchasing.

05 /

Reporting and records

Core reports

  • Maintenance due and overdue list
  • Task completion history
  • Running hours log
  • Spare parts consumption

Records for audits and surveys

  • Completed tasks with date and the person responsible
  • Remarks and deviation notes
  • Supporting evidence such as photos, certificates and log sheets

These records support class surveys, audits and inspections by showing that maintenance follows a documented system.

Working on your vessel PMS? Norsetech Group creates, migrates and manages planned maintenance systems for shipowners and ship managers. Read more about our Planned Maintenance System services.